| iHoff.com - HO Train Set |
Carter and
Todd |
|
With the long winters in the Berkshires, Carla
thought that Carter and Dad should have a winter project to work on.
So on Christmas morning Santa dropped off a train set. Below are
the images through the progression of the HO train layout. Now the train
(and the family) reside in Georgia, of course, so the hot days we can 't
be outside, we've reassembled the train and added a new section so it
fits the room... SCROLL TO THE BOTTOM FOR THE LATEST IMAGES |
WARNING |
|
Original Plan (Concept)
Week #1 (1/8/07)
Substructure of the table (4'x12' in 2 sections)
Substructure of the table (4'x12' in 2 sections)
1/2" Birch Plywood applied (4'x12' in 2 sections)
Carter showing off
Adding the base foam...
Week #3 (1/22/07)
Train - Left End (Switch Yard/Siding)
Train - Right End (Future Mountain/Lake)
Train - Full Down View
Mountain/Tunnel (Feb. 2007)
Painting the Tunnel
Painting the Tunnel, Mountain done.
Painting the Tunnel, Mountain done.
Painting the Tunnel, Mountain done. Ground Cover is Next!
Completed Right Side of the Layout.
Creek zoomed in
Creek zoomed out
Final control panel, Switch Map
Sash/Door Company, Main Street
Lumber Yard
View into the Valley & River (East Side)
West Side Switch Yard, Grain Elevators
Full Train Layout
Suwanee, GA (Summer 2008) (below)
Painting that new mountain (carefully)
Painting that new mountain (carefully)
Painting that new mountain (carefully)
In honor of both Grandpa's named Bob
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| design by: | |
|
|
|